2. Title: Orange Grove Water/Sewer Improvements
Description: Repair & replacement of water and sewer systems in the Orange Grove Way area
Location: Orange Grove Way area
Project Manager: Vaughn Fleischbein
Consultant: Kimley-Horn
Status: Design
Estimated Start Date: Spring, 2008
Estimated Completion Date: Summer, 2008
Estimated Project Cost: $1,160,000
3. Title: Lake Forest Pump Station Improvements
Description: Replace existing sewer pump station with new wet well, pumps, piping, controls & telemetry
Location: Parkshore Drive
Project Manager: Todd Eising
Designer: Black & Veatch
Status: Pre-Design
Estimated Start Date: June, 2008
Estimated Completion Date: November, 2008
Estimated Project Cost: $850,000
4. Title: E.I.D. Emergency Inter-tie
Description: Connection to E.I.D. water distribution system to serve as supply to Folsom East Area during emergency conditions
Location: East Folsom
Project Manager: Kyle Ericson
Designer: Brown & Caldwell
Status: Pre-Design
Estimated Start Date: Fall, 2007
Estimated Completion Date: Spring, 2008
Estimated Project Cost: $100,000
5. Title: Basin 6 Flow Diversion
Description: Diversion of flows between sewer system shed ares to relieve high flow locations (Design only)
Location: To be determined
Project Manager: Marcus Yasutake
Consultant: West-Yost & Associates
Status: Design
Estimated Start Date: Summer, 2008
Estimated Completion Date: Fall, 2008
Estimated Project Cost: $750,0006. Title: Miscellaneous Water Storage Tank Improvements
Description: Miscellaneous improvements to water storage tanks including re-coating, and repair & replacement of deteriorated system components
Location: Various Locations
Project Manager: Vaughn Fleischbein
Designer: City Staff
Status: Pre-Design
Estimated Start Date: Winter, 2007
Estimated Completion Date: Spring, 2008
Estimated Project Cost: $100,000
7. Title: Pipeline Master Plan Improvements
Description: Improvements to water system pumping, transmission & storage system to meet future demand. Next phase involves the construction of new zone 2 transmission main
Location: WTP to Lexington Hills via power corridor & Oak Ave Pkwy
Project Manager: Todd Eising
Consultant: To be determined
Status:
Estimated Start Date:
Estimated Completion Date:
Estimated Project Cost: $3,000,000
Designer: City Staff